Kurzanleitung standardisierte Wärmeübergabestation

1. Installation The installation is only permitted in a well-ventilated, dry room without the risk of frost, which complies with the requirements of the district heating supplier. Furthermore, it should be carried out in accordance with the design guidelines of the AGFW. The requirements of DIN 18012 (planning principles, building service connection facilities). The district heating transfer station must be positioned so as to provide sufficient space for maintenance and operation. The maximum room temperature of 35°C is not allowed to be exceeded. Check the heat transfer station in detail for damage before installing it. All connections which can be unfastened must be checked for firm seating and retightened if necessary. The system cannot be taken into operation until all welding and soldering or brazing work has been completed, and the pipe system has been flushed. Install the piping on the system without stresses. In addition, ensure adequate heat dissipation before the sealing components of the shut-off valves. The installation room should have a floor drain. CAUTION! During welding work, the grounding terminal must not be attached to the heat transfer station, because no electrical currents from the welding equipment are allowed to flow through the heat transfer station. This can cause damage to the electrical installation and the components of the heat transfer station. Quick reference guide | Standardised heat transfer station 17

RkJQdWJsaXNoZXIy NzYyNjE=