Kurzanleitung standardisierte Wärmeübergabestation

1.1 Change of the heating network connection side You will receive the heat transfer station in one packaging unit, including an electrically pre-assembled control panel. The district heating connection is located on the right side in the delivery condition. If it is necessary to change the district heating connection to the left side of the station, please follow the steps below. If this is not necessary, please continue with fastening the rear base plate (see: 1.2 Fitting of the base plate). 1 Step 1: Remove the front cover and the rear base plate by gently pushing the upper edges up or down. 2 Step 2: Open the control panel as shown and loosen the two safety screws. Then close the control panel again. 20 Quick reference guide | Standardised heat transfer station

RkJQdWJsaXNoZXIy NzYyNjE=